Milestones of TOTEM business history

1992 1994 Deputation of TOTEM engineers as research and technical consultants to research centers and steel plants in India.

1994-1996 Design and engineering of the Rotary charging unit , supply of related equipment and commissioning of it at the Bhilai Steel Plant, India

1994-1996 Development of production technology and design of equipment for the output of amorphous ribbon. Development of technology for making ferrous boron , implementation at Vijai Electricals, Hyderabad, India

1994-1996 Development of technology for injecting water-oil emulsion as additional fuel in iron making, Esfahan steel plant, Iran

1997-1998 Supply and commissioning of the ball rolling mills for Kinnera Steel, Hyderabad, India and Litzkun and Niderwipper Co., Lindlar, Germany

2002 Design and engineering of the bell-less rotary charging unit for blast furnace No.1 at West Siberia Steel Works, working out of the detailed drawings of the central gearbox for the rotary charging unit on b last furnace No.3

2003 Supply of spare parts for the rotary charging unit , operated at the Bhilai Steel Plant, India

2004-2006 Development of the project for the installation of bell-less rotary charging units on 2 blast furnaces at Jindal Power and Steel Limited, Raigarh, and Jindal South West steel pant Toranagallu, India, supervision over manufacturing of equipment, rection work and commissioning.

2004-2006 Development and implementation of automatic control system for the bell-less rotary charging unit ( ACS ROTOR) for 2 blast furnaces at JPSL, Raigarh, and JSW, Toranagallu, India.

2009 Design and engineering of the radar based stock line meter for blast furnaces (Totem Top Scan), preliminary contractual activities.